As part of the ongoing transformation at ITT Goulds Pumps in Seneca Falls, the iconic Goulds Pumps water tank will be dismantled and removed. The 97-year-old water tank has been empty and unused since 1994.
Removal of the water tower, which begins today, is part of ITT Goulds Pumps’ ongoing improvement projects.
Built in 1926, the water tank stands 150 tall and holds 45 thousand gallons of water.
The metal from the tower will be recycled.
Get the top stories on your radio 24/7 on Finger Lakes News Radio 96.3 and 1590, WAUB and 106.3 and 1240, WGVA, and on Finger Lakes Country, 96.1/96.9/101.9/1570 WFLR.